Level 2 charging
Networked chargers for resident, workplace, hospitality and depot use; wall or pedestal mounting; cable management; access controls; and usage reporting.
EV charging, electrical infrastructure and ongoing equipment care. Planned around the people who park with you and the vehicles you depend on.
Project scope, service coverage, delivery partners and pricing are confirmed during consultation.
Start with a clear plan for power, cost and daily operation. Choose the conversation that fits your site.
Give residents, tenants, employees and guests a convenient place to charge, with a plan for access, billing and ongoing care. Start with measured demand and expand as use grows.
Plan my property chargingExplore shared chargers, assigned parking and resident access. Plan for tenant turnover, usage allocation and practical parking rules.
Match charging speed to how long people park. Set employee, tenant, guest or public access and decide who pays for each session.
Compare sites by demand, electrical capacity, installation cost and ownership plans. Create a phased budget with consistent equipment and reporting.
The right charging plan starts with routes, payloads and departure times. Evaluate where electric vehicles fit, what the depot needs and how to keep daily operations moving through the transition.
Plan my fleet transitionReview daily mileage, dwell time, vehicle requirements, charging compatibility and seasonal energy needs before selecting equipment.
Plan overnight charging, shared power and selective fast charging around the next departure. Include procedures for missed sessions and equipment outages.
Compare operating costs, vehicle premiums and infrastructure investment. Pilot suitable routes, measure performance and expand when the evidence supports it.
Explore equipment and services as a coordinated scope, with products selected for your vehicles, site conditions and long-term support needs.
Networked chargers for resident, workplace, hospitality and depot use; wall or pedestal mounting; cable management; access controls; and usage reporting.
Site-specific feasibility, vehicle compatibility, utility capacity and demand-cost analysis before equipment selection. Faster charging needs a business case as well as a power source.
Capacity studies, panels, switchgear, feeders, metering, surge protection and EV-ready conduit. Coordinate service or transformer upgrades with the utility when required.
Load management, user permissions, charging schedules, payment options and reports by site, vehicle or cost center, subject to selected equipment and software.
Inventory existing assets, diagnose faults, review warranties and compare repair, network migration or replacement. Confirm hardware access and compatibility before committing to a recovery plan.
Assess solar canopies, battery storage, lighting and related electrical improvements as separate scopes. Include lifecycle cost, interconnection and any required backup-power design.
Equipment brands, connector compatibility, software features and serviceability are confirmed for each project. Solar, storage and specialized charging require separate feasibility and scope.
Your project should connect design, construction and daily operation from the beginning.
Review goals, parking or routes, utility bills, site control, existing equipment and timeline. Identify the information needed for a useful feasibility decision.
Evaluate loads, locations, accessibility, circulation, communications, drainage and protection. Coordinate qualified engineering, utility requirements and permits.
Plan procurement, trenching, foundations, conduit, wiring, mounting, signage and restoration. Agree on outages, closures and responsibilities before work begins.
Complete inspections and functional testing. Check charging, access, billing and controls. Hand over operating instructions, asset records, warranties and training.
Track faults, utilization and costs. Schedule equipment care, coordinate repairs and review capacity before adding chargers or vehicles.
Regulated engineering and electrical work will be scoped for appropriately licensed professionals. Project roles, permits and delivery responsibilities will be identified in your proposal.
Start with an assessmentA charging system needs an operating owner, a service plan and a clear response when something goes wrong.
Remote status and fault visibility on compatible equipment, issue triage, service coordination and periodic operating reports.
Discuss Monitor ↗Monitoring plus agreed inspections and preventive maintenance. Include cable and connector checks, cleaning, manufacturer-recommended service and warranty coordination.
Discuss Care ↗An agreed care scope plus charging schedules, exception alerts and energy reviews for supported vehicles, chargers and software. Custom integrations are scoped separately.
Discuss Fleet Operations ↗Support options are tailored proposals, not automatic coverage. Your agreement defines support hours, response targets, inspections, included labor, software, parts, travel and exclusions. Restoration depends on safe access, fault diagnosis and parts availability.
The right financial model fits your holding period, capital budget and operating priorities.
For properties, compare charging income with every operating cost. For fleets, compare vehicle and infrastructure investment with route-level savings. Include utilization, electricity, demand charges, service and replacement in either case.
Control the asset and the operating decisions. Purchase the system and retain charging revenue, where applicable. Budget for electricity, software, payment fees, demand charges, maintenance and replacement.
Spread eligible investment over time. Compare down payment, rate, term, total payments, security requirements and end-of-term ownership. Financing is subject to provider availability and approval.
Explore a contracted monthly service model. Where an appropriate provider is available, compare bundled equipment and service against ownership. Confirm energy costs, usage limits, escalation, service responsibilities and exit terms.
A host or revenue-share arrangement may suit locations with credible charging demand. Compare site rights, revenue allocation, minimum commitments and who carries low-utilization risk.
Illustrative ranges from Humergy’s electric division planning framework. These are budget guides, not quotations or fixed-price offers.
| Planning item | Budget range | Basis |
|---|---|---|
| Property feasibility assessment | $1,500–$3,500 | Per site; scope and deliverables agreed before work. |
| Fleet transition study | $5,000–$15,000 | Planning range for a 10–50 vehicle study. |
| Eight-port Level 2 project | $64,000–$96,000 | Illustrative installation budget for a defined site scope. |
USD. Final scope may add taxes, permits, utility contributions, major service upgrades, unusual civil work, software and ongoing service. A written proposal identifies inclusions and exclusions. Maintenance and financing are quoted separately.
Adjust a few assumptions to see the effect. These examples are planning illustrations, not forecasts, quotes or a complete investment analysis.
Both examples use constant annual assumptions and zero incentives. No financing, income tax, escalation, residual value, property-value uplift, end-of-life effects or unmodeled project costs are included. Simple payback ignores the time value of money and is not a return guarantee. These examples do not calculate NPV or IRR.
Reassess operating budgets when port or vehicle count changes. Fleet other annual costs default to $15,000 service + $12,000 demand + $4,000 reserve + $7,000 incremental insurance/admin + $3,000 software/connectivity. Avoid double counting in a final proposal.
No. Start with who will charge, how long vehicles will be parked and how much energy they need. The assessment can compare equipment, electrical capacity, software and operating costs before you select a system.
Yes, a phased layout can reserve space, conduit and electrical capacity for later expansion. The useful first phase depends on actual demand, available power and the cost of future construction.
Compatible networked systems can support different access and payment arrangements. The project should define rates, parking rules, payment fees, taxes and support responsibilities before launch. Charging revenue is not a guaranteed profit.
Equipment, distance to power, trenching, electrical capacity, utility work, accessibility, permitting and site conditions all matter. A dependable schedule follows utility and permit review; it is not based on equipment lead time alone.
They may, but the answer depends on routes, vehicle prices, energy rates, maintenance, charging infrastructure and financing. A fleet study compares the full investment and operating plan rather than fuel cost alone.
Request an equipment review. Serviceability depends on the manufacturer, model, warranty, available parts, software access and network compatibility. The review can identify a repair, migration or replacement path.
Only after eligibility, funding availability and timing are checked for your project. Initial estimates should stand on their own without an unapproved incentive. Programs change, and an application is not an award.
No. Your proposal will define inspections, labor allowances, parts, travel, software fees, warranty work and exclusions. Support hours, response targets and restoration obligations must be stated in the service agreement.
Not automatically. Backup requires a system designed for that purpose, with appropriate controls, protection and operating limits. Solar and storage should be evaluated for their specific economic and operational value.
Tell us the city and state of your property or depot. Humergy will confirm the service area, available project team and proposed scope during consultation.
Tell Humergy what you manage and what you want to accomplish. Start with a project conversation, then agree on an assessment scope before committing to design or installation.
Accepting property and fleet project inquiries. Availability, project team and pricing are confirmed during consultation.
Have utility bills, a site plan or route data? Mention what is available. Documents can be requested through an appropriate channel after initial contact.
here@humergy.com ↗Prepare a project inquiry by email to here@humergy.com.